Holbrook Ward Connector

Rock Solid constructed approximately 10 miles of new trail in Bountiful Utah. This includes dedicated climbing, downhill, and multi-directional trails. Primary concerns included exceptional drainage, as this is a southern facing slope that will be used in shoulder seasons.

Flatter terrain was lifted and tilted to promote early drying and avoid water damage, while the majority of large stones and boulders were brought back into the tread for use as armoring, textures, and features.

A combination of machine built flow and hand-built sections maximize the challenges riders face, while minimizing the impact to existing steep and rocky terrain. Several sections were hand built to preserve natural tread and rock features, while incorporating natural aspects to the trail.

Trail Details

View Holbrook Ward Connector on Trailforks.com