Base of Pine Knob Trails

This trail is part of the system at the base of Pine Knob near the future campground and alongside Shipwreck Creek. The uphill terrain of this trail features a rock and dirt switchback and is set to open in 2021. 

Trail Details

Split Rock Wilds and the campground are slated to open in 2021.